Ydro process mikroorganizmai

YDRO Process® microorganisms

For wastewater treatment plants, landfills, agriculture, and water bodies.

Usage recommendations

  1. The wastewater treatment process is not changed after starting YDRO product dosing.
  2. Excess sludge removal continues as long as there is a need.
  3. Excess sludge removal equipment remains in operation and is maintained.
  4. Doses up to 500 g of product are mixed with 10 liters of water, from 500 g to 1000 g with 20 liters, and so on.
  5. The water temperature for preparing YDRO should be around 15–20 °C.
  6. The product is dosed every day at the same time (unless otherwise instructed by the manufacturer).
  7. After adding YDRO to the water, stir for about 1–2 minutes and leave it for 14–16 hours (no longer or shorter).
  8. YDRO is dosed into the sewer system, sand trap/screening chamber, or aeration tank.
  9. If one day is missed, the next day’s dose must include that day’s dose plus the missed day’s dose.

CONTACT US

Sales
Lithuania: Tel. +370 687 70906
Poland: Tel.+48 5022 78506
Latvia: Tel. +371 200 82006